7.2 If the above expense is estimated design fee, both parties shall check the design fee as per the approved budgetary estimate of the preliminary design, after the examination and approval of preliminary design. During the construction of this project, if there is any adjustment in budgetary estimate, the design fee will also be adjusted correspondingly.
第八条 支付方式Article 8 Form of Payment
8.1本合同生效后三天内,发包人支付设计费总额,计 16 万元作为定金(合同结算时,定金抵作设计费)。
8.1 The party issuing contract shall pay the total design fee, within three days after the execution of this contract, that is, 160000 RMB as a deposit (the deposit will be seen as a part of design fee, at the time of contract settlement).
8.2设计人提交 全部 设计文件之前,发包人结清设计费,不留尾款。
8.2 Before the designer submits all design documents. the design charge is all squared by the employer, and no final payment left.